Laying a sewer pipe in the ground - Blog about repair

Laying a sewer pipe in the ground

01-04-2018
Useful

Creating a comfortable environment in the house, you can not do without sewage. Such systems have become an integral part of our life. Sewerage consists of internal and external parts. In this article we will describe how the sewer pipes are laid in the ground. Let's take a closer look at how this is done and what needs to be considered.

What materials to use

Before you figure out how to lay a pipe under the ground, tell about the pipes themselves. Which ones are better suited for an outdoor sewer system?

For such purposes, you can use pipes of various materials. Previously, external sewers were often laid out of cast iron pipes. But today such pipes are almost never used, because:

  1. They are quite heavy and you need to work with them with the help of technology.
  2. Cast iron is not as durable as some modern materials.

In modern construction many use plastic products. For example, pipes made from polyethylene, polypropylene and polyvinyl chloride are used for laying sewage systems. Most often use the first two options. They are quite durable (especially if they have a corrugated two-layer construction) and are relatively cheap. In addition, these pipes are not subject to corrosion and easily tolerate a long stay in an aggressive environment.

Choosing pipes for sewage, it is necessary to determine their diameter. As a rule, this figure for exterior work is 110 mm. There are pipes and larger diameter, but they are rarely used in household systems.

Also, various connecting and additional elements of sewage systems are made of plastic. On sale you can find all kinds of couplings, bends, adapters, etc. with their help, you can create a complex and efficient system.

Cooking a trench

The technology of laying sewer pipes underground is quite simple. The trench is digging, the pipes are stacked and interconnected, and the trench is buried. Let's get acquainted with the first stages - the preparation of the trench.

Before starting work, it is worth knowing what depth and angle to lay the pipes at. According to the current SNiP, sewer systems should be installed half a meter below the ground freezing level. This indicator can be found in any construction company or using the directory.

For example, if in your region in winter the ground freezes to a depth of 2 meters, then the depth of the sewage pipe should be 2.5 meters. But sometimes you can move away from this indicator. Everything will depend on the circumstances (pipe length, soil properties, etc.). The main thing is that the sewer pipe should be laid at least half a meter to the ground.

Now that you know the depth of the gasket, you can start digging trenches. This can be done manually or with an excavator. At the same time, the trench width should be not less than 0.6 m (when using a pipe O 110 mm). You also need to make a reserve depth (to create a pillow).

The next step will be the preparation of the base. The bottom of the trench is leveled and tilted. It is necessary that the drains flow freely to the spillway. The slope is usually 1–2 degrees (or 1–2 centimeters per meter of pipe).

Then the bottom must be compacted and a pillow must be created on it. Sand or gravel can be used as a material. The thickness of the pillow - 10? 15 cm. When laying it, do not forget about the slope.

Two meters to the junction with the inlet pipe, the pillow must be tamped. It is also worth to arrive two meters before installing the manhole. If the system provides for the installation of sockets, it is necessary to make a recess in this place.

Installation of sewer pipes

After preparing the trenches, proceed to the installation of pipes. It is worth starting from the foundation of the house. The rules themselves are as follows:

  • Pipes are placed in trenches. In this case, the pipe should be located at the far (in the direction of installation) end of the pipe.
  • The straight end of one pipe and the socket of the other, are cleaned of dirt and debris. Also it is worth checking the absence of foreign objects inside the pipe.
  • Both ends must be lubricated with a special compound that will facilitate the connection and make it more reliable (silicone or special sealant).
  • The straight end of the pipe is inserted into the socket.

Such actions need to be done with the entire system. If the system provides turns, they are made using taps (they are available with angles of 15, 30 and 45 degrees). Such designs also have a flat end and socket.

It is worth considering that if you have a sewer length more than 15 m, then it is advisable to make a viewing well. It will allow cleaning of blockages and significantly prolong the life of the system.

If sewer pipes are laid above the level of soil freezing, it is necessary to warm them. To do this, you can use any material with thermal insulation properties (most importantly, that it was not subject to rotting). It is wrapped around the entire pipe and securely fastened.

Trench backfilling

Before backfilling the trench it is necessary to check the correctness and sufficiency of the slope. To do this, you can simply pour a small amount of water into the system. If you did everything correctly, then you can start backfilling.

According to the SNiP, you can use the excavated soil to put the trench back to sleep, but some rules must be followed. First, there should be no large stones in the ground. Secondly, dense blocks of soil need to be broken. Inclusions larger than 30 mm can damage sewer pipes.

The best option is to fill the hole with a pipe with sand, and then pour the ground and crushed and cleaned from large stones.

It is necessary to fill up gradually. Each layer of 5 cm must be sealed. In this case, ramming the soil above the pipe itself (up to a height of 0.3 m) is not recommended. Initially, this is done only on the sides. After the trench is filled up to a height of 30? 40 cm, you can tamp over the entire area.

Video

This video will help you learn how to properly lay the sewer pipes of a country house:

This video contains recommendations of experts about the choice of pipes for external and internal sewage systems: