In many cases it becomes necessary to raise the level of the floor on the balcony. This is due to the fact that when leaving the balcony, in most layouts the floor level is much lower than in the apartment. Moreover, the high threshold of convenience does not add. The ideal solution in this situation would be to raise the floor of the balcony to the level of the apartment. This will not only allow you to warm the floor on the balcony, but also make the passage more comfortable, now you don’t need to stumble, and your loved ones will just say thank you. The easiest way to raise the level of the floor is considered to be a concrete mix. This we will do.

Assess the condition of the balcony

Before performing repair work on the balcony, it is necessary to assess the initial condition of the floor. In a new building this may just be a bare concrete slab. In the secondary there are often wooden squeaky floors in extremely unsatisfactory condition. For the real owner in his house, the balcony is an extension of the apartment and he, too, must be kept in good order. If you want to equip a balcony and turn it into a comfortable resting place, or connect it with an apartment, preliminary work should be done right now.

Preliminary work

If the floor of the balcony is a bare concrete slab, it is necessary to thoroughly clean the surface from debris. Very often there are cracks between the walls and slabs, they must be sealed with cement mortar. After that, you can begin to apply waterproofing. There are several reliable, proven and simple ways to do this.

Bitumen mastics and special water-repellent penetrating mixtures have proven themselves very well. They are easy to use and perfectly protect the coating from moisture.

We define, we look, we measure ...

Now you can begin to raise the floor level. Here it is necessary to decide how and what to raise. The simplest way is considered to be a conventional concrete screed. Such work practically does not require experience, there is nothing complicated. As a result, you get a smooth, durable and durable coating, on which you can then put any flooring, starting from the carpet, ending with the laminate. However, this method has one major drawback - it is a lot of weight. Balcony can simply not stand it.

For a balcony it is categorically not recommended to use a concrete tie, if its thickness is more than 8 cm. Also this method cannot be used at temperatures less than 10 ° C.

The order of work

  1. Measurements. The floor level must be strictly horizontal. To do this, mark its position on the walls with the help of a level.
  2. Creating formwork. This is necessary if there is a possibility of concrete running off at the edges of the slabs. As a formwork will fit any timber or planks that need to be securely fastened to the outer parts of the concrete slab. After curing, the formwork must be removed.
  3. Waterproofing. Regardless of whether you use water-repellent mixtures, or waterproofing in the form of flooring, both options should provide for overlapping walls above the level of the future floor. If a special film is used for waterproofing, ideally it should be a single piece. Fortunately, most balconies have a small area. However, if you have to use more than one piece of material, a large overlap of at least 15 cm is required.
  4. Lighthouses As beacons, aluminum U-shaped profiles located horizontally with sharp edges pointing up are best suited for such a screed. It is on them that the rule will slide. After leveling the profiles by level, they are additionally fixed by placing cement mortar down. After its hardening, you can continue to work.
  5. Damper tape. On the balcony can occur quite large temperature drops. To prevent the concrete screed from collapsing due to thermal expansion, a special damping tape should be stuck onto the walls.
  6. After finishing the preparatory work, you can proceed to pouring the floor with concrete mix. To do this, dilute the mixture, according to the instructions, mix thoroughly and begin to pour. It starts from the far wall, moving towards the exit. The mixture is superimposed just above the beacons, a width convenient for alignment. The rule is chosen so that its length is slightly more than the width between the lighthouses. Putting the mixture, gradually move along the lighthouses, leveling the floor.
  7. The next day, the lighthouses must be carefully removed and the surface must be leveled with a cement-sand mortar.

It must be remembered that the thicker the layer of concrete screed, the longer it will dry. This can occur within a few days. At the same time, high temperatures on the balcony during freezing can damage the tie, cracks form on the surface. To avoid this, it is necessary to cover the new floor with a plastic wrap for two weeks, wetting it with water. After complete hardening of the composition, it is necessary to completely level the surface, removing various artifacts and flows. The final touch before laying the finish coating is a base primer.

You can raise the floor on the balcony in a simpler way by setting lags and laying wooden flooring. See more about this technology in the video at the end of the article.

See also:

  • how to level a wooden floor under a laminate;
  • what punch to choose.

Video

Tips on the technology of raising the floor on the balcony. Lifting method using wooden logs: