At first glance it may seem that digging a trench is easy - I took a shovel and dig, but not everything is so simple. If the trench is designed for any communication or for other specific purposes, then you need to do everything correctly and take into account some of the nuances. In this article we will describe how to dig a trench for the foundation and plumbing, consider how deep to dig.

First you need to decide on the direction and depth of the trench, prepare the necessary tools and materials. The future trench must fit the communications laid in it (pipes, cables, etc.), and there must be enough materials to complete this excavation work.

The very direction of the trench should be well thought out, because earthworks can negatively affect the life of plants. For example, part of the root system of fruit trees, the damage of which can cause illness or even death, may end up on the path of the trench.

It would be useful to find out what kind of ground you have to deal with. This is important, because the soil is also different. She may be:

  • sandy;
  • stony and quite loose;
  • rich in humus and, accordingly, moist.

How to dig a trench in these types of soil so that its straight walls in the process of work will not collapse if, for example, it is about one and a half meters deep? Be sure to provide a backup. They can be made from small sheets of plywood or any other suitable material that you have in stock.

Under the foundation

Before digging it is important to immediately determine the place where you will put the soil extracted from the pit. From the edge of the trench, it must be discarded at a distance of at least half a meter, otherwise, when the hill of soil grows up, it will simply crumble back. As an option, you can immediately install the formwork, and, digging inside it, pour the soil outside.

If an extension to the house is being made, then by no means should one dig a trench undermining the foundation of this structure.

Before you start digging a trench pit under the foundation, you need to carefully mark everything. First, mark the outer perimeter. At the corners it is necessary to drive in wooden stakes or pieces of metal reinforcement, and then stretch the thread (kapron, fishing line or twine) along the whole marking. It is important that the marking angle geometry is strictly 90 ?. This can be checked with a tape measure: measure all sides of the rectangular marking (from corner to corner), then measure the diagonal. In a square or rectangular building, it is enough to compare the diagonals - if they are equal, then the angles are really straight. If not, then you have to measure everything again and, as a result, interrupt the pegs. After all these measurements are made, digging trenches for load-bearing walls. Then you can dig transverse trenches for partitions that will be inside the future structure.

The trench for the foundation must be dug at a distance of at least three meters from the neighbor's plot.

Какaboutй дaboutлжна быть глубина

When calculating the depth of the trench do not forget about the drainage and sand pad. The process of manual digging itself is quite laborious, because the layer of earth needs to be dug extremely horizontally so as not to disturb the density of the lower layer.

The soil covered with walls must be removed. Tamping it makes no sense, since you still will not achieve the initial density of the structure.

Depth in different types of soil:

  • Stony or sandy soil: depth up to 1 m.
  • Sandy soil: depth up to 1.3 m.
  • Loam and clay soil: up to 1.5 m.
  • Dense ground: up to 2 m.

Trench width

It should correspond to the width of the concrete base, which, in turn, should be slightly larger than the width of the walls. For example, if it is a sawn shell rock, then the laying will most likely be in stone. At the same time you need to add another 3-5 cm for various finishing works. Often the trench width is about 70 cm. This is the optimal width at which it is most convenient to remove the soil from the pit.

It also happens that for such earthworks you are forced to hire workers. It is clear that each cube of extracted land costs money. How to calculate the volume of the trench to make the appropriate payment for digging under the foundation? It is necessary to measure out the total length of the entire trench, and with it its width. Then calculate the total area by multiplying the length by the width. The resulting product is multiplied by the height of the pit and we obtain, so the cubes are the total volume of the trench. For example, if you have a total trench length of 30 m, a width of 0.7 m, and a height of 1.5 m. Then you can calculate the volume as follows: 30 × 0.7 = 21 m2; 21? 1,5 = 31.5 m3

Under a plumbing

Taking a plumbing into the house is another important reason to take a shovel. Be prepared for the fact that you will encounter some inconveniences in the process of work: the trench is likely to be 1.5–2 m deep). In general, the depth of soil freezing and the type of soil have a profound effect on the depth of the trench under the water supply system. For example, in regions with a temperate climate (average winter temperature: -10aboutC), where mainly loamy soil prevails, the freezing depth does not exceed 1.5 m. If it is sandy soils consisting of coarse sand, the freezing limit will be deeper: about 1.9 m.

When there is no possibility (or desire) to go deep into the ground by 2 meters, then there is only one way out - to insulate the pipe. In this case, it can be located at a depth of up to half a meter. If the water intake is made from a well or a well, then it is necessary to dig a trench for the water supply system with a proper slope, so the water will not remain in the pipes, but will go by gravity towards the water source.

Such earthworks are always laborious, take enough time, require good planning and preparation. If you or someone else is digging a trench manually for any communication, it will be better if you initially do everything correctly. Only then, after doing such work, you will not have the feeling that you have wasted time, effort and money.