A small plot of 6 acres, this is a real celebration of the soul for lovers of outdoor recreation and gardeners, because in fact from this site you can get enough crops to provide one family with vegetables for a whole year (with proper organization of work, of course).

But it's not about gardening, but about construction. There is an ideal combined solution, when a small area turns into a real relaxation center, with elements of horticulture and gardening, but it all begins with the construction of a country house.

Simple and tasteful.

Why choose this option

Square and Africa square.

Summer houses of the bar 6x6 m were chosen by us not by chance. It is this structure that allows you to get the maximum amount of bonuses when choosing materials, using the attic space and turning it into an attic allows you to get quite tolerable housing that can be used for its intended purpose all year round.

Paradoxical as it may sound, even the country houses from a 6x9 m bar do not provide such opportunities as a house with a section of 36 square meters.

So, about the benefits:

  1. If you already had time to ask about a bar that goes to the construction of any building, then you certainly noticed that the standard length of this material is 6 m. Thus, you buy material and build a house without unnecessary waste, additional joining seams and with the minimum amount of material processing that will allow you to quickly enough to build a country house with your own hands;
  2. Square section of the house is preferable to rectangular. Let us explain, in a square house all the faces of the structure exert the same pressure on the supports, in a rectangular house, additional amendments are necessary. And although all this is quite easily calculated and solved by placing additional supports, the square foundation is considered more earthquake-resistant;
  3. House of square section is easier to focus on the terrain. Square houses can be easily placed almost anywhere in their plots, and, for example, country houses from a bar of 6x8 m, will have to be exposed and decide exactly how the cardinal points and the layouts of the plots themselves are;
  4. Long-term benefits. Recently it has become very fashionable to go on weekends and holidays to the country. Considering the fact that many holidays fall in the winter and spring periods of the year, in order to hold them in nature, elementary warmth in the house is necessary.

So, it is the square house that is easier to heat, the heat will be distributed evenly, and the area and cubic capacity of the house will allow to build only one heat source, and not a few, as would be required for a rectangular structure.

Not excluded architectural additions that do not carry significant financial and weight load.

Our help! The use of round timber, also allows you to build a structure of 6 to 6m with minimal material costs. Considering that the structure is assembled with a small release of the beam to the outside, you can use 7 m of logs and customize them for the foundation of the 6x6 m structure.

Start of construction

The project has been compiled, the material has been delivered, construction can begin.

 

Photo of one of the possible options for the foundation.

Tip! Do not overload the house layout with a large number of rooms. It is enough for you to make one internal partition on the first level and then from a bar of a smaller diameter. The purpose of this partition will be more basic, for the beams of the ceiling of the attic or the second floor. In case of an emergency, internal partitions can be made much simpler and cheaper using the framework construction principles; moreover, they can be easily dismantled and rearranged if necessary.

We begin the first stage of construction marking and construction of the foundation for the house from a bar.

We carry out the following:

  • We are preparing a site for future construction. Needless to say, the site (if possible) is better leveled, removed and uprooted green spaces, as well as marking. By itself, a 36-square-meter playground is easily laid out with 4 pegs and twine. You can use the construction of three strings (twine), but the simplest method for checking the correctness of the angles is to measure the distance diagonally;
  • For a small house a powerful foundation is absolutely not needed. Enough piles, and they can both be poured and built of brick - these are the most economical types of foundations. But there is one thing but it is necessary to protect the piles of bricks from moisture, otherwise prolonged contact with water can destroy the pile;
Piles are best to build on their own.
  • For a house of 6 by 6 m, 12 piles will be sufficient, which (according to all canons of construction) must be set 10-15 cm below the ground freezing level, for a sand-gravel pavement;
  • The simplest type of structure alignment in a single horizontal plane and the support for the entire wooden house is a channel, which is welded to prominent metal fragments of pile reinforcement.

Building walls and roofs

The openings are prepared, but not cut to the end.

The dacha from a timber of 6 to 6 meters is assembled quickly and in fact for the month of construction you will have a ready-made house with all the ensuing consequences, but before you breathe a sigh of relief, we build:

  • We install the first timber, for which we lay a sheet of roofing material between the channel and the timber (you can fold it twice) with a release of 10 cm on each side of the timber. Fixation of timber occurs with bolts, impregnation of the beam with antiseptics and antipyretic agents is obligatory;
  • Next, we collect the wall crown for the crown. Fastening the beams to each other can make a spike in the groove, and it is possible in half-wood, fixing with metal brackets is allowed, fixing the same top bar to the lower one is done with pins 1 m in staggered order;
  • At the assembly stage, lags for floors and ceilings are installed, cells for windows and doors are being prepared, but the windows and doors themselves are not completely cut out;
  • The simplest option is considered to be a set of two attic walls with the same bar, rafters and mauerlat are prepared separately from boards or beams of smaller diameter, and lathing is also carried out. Roof covering roofing material at this stage is mandatory.

That's basically all the instructions for assembling a house. All subsequent work on interior decoration, insulation occur one year after construction.

Finally

Compact house to give

The country house is an interesting and useful structure, the construction described by us is optimal in terms of price-quality ratio. The video in this article will reveal the topic of the corresponding video cutting.